Innovation call
Innovation tender for project developers
The brief
TRICERA energy and the experienced project developer ABO Wind / Abo Energy came together as part of an innovation tender. The photovoltaic system was installed by ABO Energy, while the battery storage system was supplied by TRICERA energy.
The challenge was to provide a so-called higher-level EZA controller in which both the PV system and the battery storage system are integrated. Batteries from the automotive sector were used, which were tested and integrated technically, electrically and in terms of software using TRICERA’s own developed system.
The solution: The in-house software made it possible to regulate the power at the grid connection point. As with every innovation tender, it should be noted that the battery storage system may only be charged from the PV system. Discharging into the grid is also permitted.
More about this project at Abo Energy on LinkedIn: Innovation Park Weichenried

Innovation tender for project developers
Auftraggeber | ABO Wind |
Gewerbe | PV and wind power facilities planning |
Installation | 2023/2024 |
Leistung | 7,1 MW |
Kapazität | 25,4 MWh |
Anwendung | Innovation call |