{"id":4115,"date":"2025-10-23T13:29:39","date_gmt":"2025-10-23T11:29:39","guid":{"rendered":"https:\/\/tricera.energy\/?post_type=portfolio&#038;p=4115"},"modified":"2026-06-04T13:35:23","modified_gmt":"2026-06-04T11:35:23","slug":"battery-storage-integration-into-existing-wind-farm-infrastructure","status":"publish","type":"portfolio","link":"https:\/\/tricera.energy\/en\/battery-storage-integration-into-existing-wind-farm-infrastructure\/","title":{"rendered":"TRICERA energy is integrating battery storage systems into existing wind farm infrastructure for Eurus Energy Europe"},"content":{"rendered":"<p><b><strong>Waardenburg, Netherlands, October 23, 2025<\/strong><\/b><\/p>\n<p>TRICERA energy, the engineering, procurement, and construction (EPC) contractor and system integrator for large-scale battery storage systems, and Eurus Energy Europe (\u201cEurus\u201d), a developer and investor in renewable energy projects operating in six European countries, have signed a contract to build a battery storage facility near the town of Waardenburg in the Netherlands. Eurus is part of the Toyota Tsusho Corporation.<\/p>\n<p>The grid-connected battery storage system, with an installed capacity of 40 MWh and a power output of 15 MW, will be built in the municipality of West-Betuwe within the 21 MW Eurus wind farm and is expected to participate in energy trading upon completion. A key feature of this project is the integration of the storage system into the existing wind farm infrastructure.<\/p>\n<p>In this project, TRICERA energy is focusing on the engineering, the construction of the entire facility\u2014including the medium-voltage substation\u2014and the system integration of the containers from Tier-1 battery manufacturer Gotion Hightech. With the energy management system developed by TRICERA, the project relies on a flexible solution that is specifically tailored to the project\u2019s requirements.<\/p>\n<p>As the company responsible for the balance-of-plant, TRICERA can also contribute its core competencies to a significant degree. The implementation of various system components such as inverters, transformers, medium-voltage systems, and the EMS demonstrates that the battery storage EPC and integrator possesses the technical, electrical, and software expertise to meet the complex requirements of the system architecture in other markets and regulatory frameworks as well.<\/p>\n<p>Lars Fallant, CEO of TRICERA energy, comments: \u201cThis project marks the company\u2019s first major undertaking in the Netherlands. With the battery storage system for Eurus, we are consistently pursuing our growth strategy of successfully building battery storage systems for our customers as an EPC and system integrator, even outside of Germany. At the same time, it demonstrates once again that we are able to offer and implement sensible and cost-effective solutions for complex project conditions. Of particular note is the excellent and trusting collaboration with Eurus, Toyota Tsusho, and the other partners involved, which played a key role in shaping the constructive dialogue in the lead-up to the project.\u201d<\/p>\n<p>&nbsp;<\/p>\n<p><strong>Background TRICERA energy<\/strong><\/p>\n<p>To a new era \u2013 that is the vision of TRICERA energy GmbH. The sustainable company based in Freiberg and Dresden specializes in the development, construction and operation of medium (&lt;500 kWh) to large (&gt;2 MWh) battery storage systems, thus enabling an optimized, demand-oriented and renewable energy supply. The core business comprises four areas of expertise: Engineering and consulting, project development, system integration as well as O&amp;M. With 90 employees consisting of leading experts in the battery industry and many years of experience in various fields of expertise, TRICERA energy is a qualified partner when it comes to the energy transition. To date, TRICERA has installed 280 megawatt-hours of capacity and 152 megawatts of power.<\/p>\n<p>Further information at: <a href=\"https:\/\/tricera.energy\/en\/\">https:\/\/tricera.energy<\/a><\/p>\n<p>&nbsp;<\/p>\n<p><strong>Contact person\u00a0<\/strong><\/p>\n<p>Philipp Berger<br \/>\nTelefon +49 151 57675400<br \/>\nphilipp.berger@tricera.energy<br \/>\nIndustriestra\u00dfe 65<br \/>\n01129 Dresden<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Waardenburg, Netherlands, October 23, 2025<br \/>\nTRICERA energy, the engineering, procurement, and construction (EPC) contractor and system integrator for large-scale battery storage systems, and Eurus Energy Europe (\u201cEurus\u201d), a developer and investor in renewable energy projects operating in six European countries,<\/p>\n","protected":false},"author":10,"featured_media":4124,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"_custom_body_class":"","_custom_post_class":"","footnotes":"","_members_access_role":[],"_members_access_error":""},"portfolio_category":[54],"portfolio_tag":[],"class_list":["post-4115","portfolio","type-portfolio","status-publish","has-post-thumbnail","hentry","portfolio_category-press-release"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.2 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Battery storage integration into existing wind farm infrastructure<\/title>\n<meta name=\"description\" content=\"TRICERA energy and Eurus Energy Europe have signed contract to build battery storage facility in the town of Waardenburg in the Netherlands\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/tricera.energy\/en\/battery-storage-integration-into-existing-wind-farm-infrastructure\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Battery storage integration into existing wind farm infrastructure\" \/>\n<meta property=\"og:description\" content=\"TRICERA energy and Eurus Energy Europe have signed contract to build battery storage facility in the town of Waardenburg in the Netherlands\" \/>\n<meta property=\"og:url\" content=\"https:\/\/tricera.energy\/en\/battery-storage-integration-into-existing-wind-farm-infrastructure\/\" \/>\n<meta property=\"og:site_name\" content=\"TRICERA energy\" \/>\n<meta property=\"article:modified_time\" content=\"2026-06-04T11:35:23+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/tricera.energy\/wp-content\/uploads\/2025\/10\/Eurus_TRICERA_1-1.png\" \/>\n\t<meta property=\"og:image:width\" content=\"2395\" \/>\n\t<meta property=\"og:image:height\" content=\"1252\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/tricera.energy\\\/en\\\/battery-storage-integration-into-existing-wind-farm-infrastructure\\\/\",\"url\":\"https:\\\/\\\/tricera.energy\\\/en\\\/battery-storage-integration-into-existing-wind-farm-infrastructure\\\/\",\"name\":\"Battery storage integration into existing wind farm infrastructure\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/tricera.energy\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/tricera.energy\\\/en\\\/battery-storage-integration-into-existing-wind-farm-infrastructure\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/tricera.energy\\\/en\\\/battery-storage-integration-into-existing-wind-farm-infrastructure\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/tricera.energy\\\/wp-content\\\/uploads\\\/2025\\\/10\\\/Eurus_TRICERA_1-1.png\",\"datePublished\":\"2025-10-23T11:29:39+00:00\",\"dateModified\":\"2026-06-04T11:35:23+00:00\",\"description\":\"TRICERA energy and Eurus Energy Europe have signed contract to build battery storage facility in the town of Waardenburg in the Netherlands\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/tricera.energy\\\/en\\\/battery-storage-integration-into-existing-wind-farm-infrastructure\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/tricera.energy\\\/en\\\/battery-storage-integration-into-existing-wind-farm-infrastructure\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/tricera.energy\\\/en\\\/battery-storage-integration-into-existing-wind-farm-infrastructure\\\/#primaryimage\",\"url\":\"https:\\\/\\\/tricera.energy\\\/wp-content\\\/uploads\\\/2025\\\/10\\\/Eurus_TRICERA_1-1.png\",\"contentUrl\":\"https:\\\/\\\/tricera.energy\\\/wp-content\\\/uploads\\\/2025\\\/10\\\/Eurus_TRICERA_1-1.png\",\"width\":2395,\"height\":1252},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/tricera.energy\\\/en\\\/battery-storage-integration-into-existing-wind-farm-infrastructure\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Startseite\",\"item\":\"https:\\\/\\\/tricera.energy\\\/en\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Portfolio\",\"item\":\"https:\\\/\\\/tricera.energy\\\/presse\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"TRICERA energy is integrating battery storage systems into existing wind farm infrastructure for Eurus Energy Europe\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/tricera.energy\\\/#website\",\"url\":\"https:\\\/\\\/tricera.energy\\\/\",\"name\":\"TRICERA energy\",\"description\":\"Innovative Batteriespeicher f\u00fcr Energieprojekte und Netzbetreiber\",\"publisher\":{\"@id\":\"https:\\\/\\\/tricera.energy\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/tricera.energy\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/tricera.energy\\\/#organization\",\"name\":\"TRICERA energy\",\"url\":\"https:\\\/\\\/tricera.energy\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/tricera.energy\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/tricera.energy\\\/wp-content\\\/uploads\\\/2024\\\/02\\\/logo-yoast@2x.png\",\"contentUrl\":\"https:\\\/\\\/tricera.energy\\\/wp-content\\\/uploads\\\/2024\\\/02\\\/logo-yoast@2x.png\",\"width\":696,\"height\":696,\"caption\":\"TRICERA energy\"},\"image\":{\"@id\":\"https:\\\/\\\/tricera.energy\\\/#\\\/schema\\\/logo\\\/image\\\/\"}}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Battery storage integration into existing wind farm infrastructure","description":"TRICERA energy and Eurus Energy Europe have signed contract to build battery storage facility in the town of Waardenburg in the Netherlands","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/tricera.energy\/en\/battery-storage-integration-into-existing-wind-farm-infrastructure\/","og_locale":"en_US","og_type":"article","og_title":"Battery storage integration into existing wind farm infrastructure","og_description":"TRICERA energy and Eurus Energy Europe have signed contract to build battery storage facility in the town of Waardenburg in the Netherlands","og_url":"https:\/\/tricera.energy\/en\/battery-storage-integration-into-existing-wind-farm-infrastructure\/","og_site_name":"TRICERA energy","article_modified_time":"2026-06-04T11:35:23+00:00","og_image":[{"width":2395,"height":1252,"url":"https:\/\/tricera.energy\/wp-content\/uploads\/2025\/10\/Eurus_TRICERA_1-1.png","type":"image\/png"}],"twitter_card":"summary_large_image","schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/tricera.energy\/en\/battery-storage-integration-into-existing-wind-farm-infrastructure\/","url":"https:\/\/tricera.energy\/en\/battery-storage-integration-into-existing-wind-farm-infrastructure\/","name":"Battery storage integration into existing wind farm infrastructure","isPartOf":{"@id":"https:\/\/tricera.energy\/#website"},"primaryImageOfPage":{"@id":"https:\/\/tricera.energy\/en\/battery-storage-integration-into-existing-wind-farm-infrastructure\/#primaryimage"},"image":{"@id":"https:\/\/tricera.energy\/en\/battery-storage-integration-into-existing-wind-farm-infrastructure\/#primaryimage"},"thumbnailUrl":"https:\/\/tricera.energy\/wp-content\/uploads\/2025\/10\/Eurus_TRICERA_1-1.png","datePublished":"2025-10-23T11:29:39+00:00","dateModified":"2026-06-04T11:35:23+00:00","description":"TRICERA energy and Eurus Energy Europe have signed contract to build battery storage facility in the town of Waardenburg in the Netherlands","breadcrumb":{"@id":"https:\/\/tricera.energy\/en\/battery-storage-integration-into-existing-wind-farm-infrastructure\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/tricera.energy\/en\/battery-storage-integration-into-existing-wind-farm-infrastructure\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/tricera.energy\/en\/battery-storage-integration-into-existing-wind-farm-infrastructure\/#primaryimage","url":"https:\/\/tricera.energy\/wp-content\/uploads\/2025\/10\/Eurus_TRICERA_1-1.png","contentUrl":"https:\/\/tricera.energy\/wp-content\/uploads\/2025\/10\/Eurus_TRICERA_1-1.png","width":2395,"height":1252},{"@type":"BreadcrumbList","@id":"https:\/\/tricera.energy\/en\/battery-storage-integration-into-existing-wind-farm-infrastructure\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Startseite","item":"https:\/\/tricera.energy\/en\/"},{"@type":"ListItem","position":2,"name":"Portfolio","item":"https:\/\/tricera.energy\/presse\/"},{"@type":"ListItem","position":3,"name":"TRICERA energy is integrating battery storage systems into existing wind farm infrastructure for Eurus Energy Europe"}]},{"@type":"WebSite","@id":"https:\/\/tricera.energy\/#website","url":"https:\/\/tricera.energy\/","name":"TRICERA energy","description":"Innovative Batteriespeicher f\u00fcr Energieprojekte und Netzbetreiber","publisher":{"@id":"https:\/\/tricera.energy\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/tricera.energy\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/tricera.energy\/#organization","name":"TRICERA energy","url":"https:\/\/tricera.energy\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/tricera.energy\/#\/schema\/logo\/image\/","url":"https:\/\/tricera.energy\/wp-content\/uploads\/2024\/02\/logo-yoast@2x.png","contentUrl":"https:\/\/tricera.energy\/wp-content\/uploads\/2024\/02\/logo-yoast@2x.png","width":696,"height":696,"caption":"TRICERA energy"},"image":{"@id":"https:\/\/tricera.energy\/#\/schema\/logo\/image\/"}}]}},"_links":{"self":[{"href":"https:\/\/tricera.energy\/en\/wp-json\/wp\/v2\/portfolio\/4115","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/tricera.energy\/en\/wp-json\/wp\/v2\/portfolio"}],"about":[{"href":"https:\/\/tricera.energy\/en\/wp-json\/wp\/v2\/types\/portfolio"}],"author":[{"embeddable":true,"href":"https:\/\/tricera.energy\/en\/wp-json\/wp\/v2\/users\/10"}],"replies":[{"embeddable":true,"href":"https:\/\/tricera.energy\/en\/wp-json\/wp\/v2\/comments?post=4115"}],"version-history":[{"count":0,"href":"https:\/\/tricera.energy\/en\/wp-json\/wp\/v2\/portfolio\/4115\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/tricera.energy\/en\/wp-json\/wp\/v2\/media\/4124"}],"wp:attachment":[{"href":"https:\/\/tricera.energy\/en\/wp-json\/wp\/v2\/media?parent=4115"}],"wp:term":[{"taxonomy":"portfolio_category","embeddable":true,"href":"https:\/\/tricera.energy\/en\/wp-json\/wp\/v2\/portfolio_category?post=4115"},{"taxonomy":"portfolio_tag","embeddable":true,"href":"https:\/\/tricera.energy\/en\/wp-json\/wp\/v2\/portfolio_tag?post=4115"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}